|

FRIDAY, DECEMBER 2, 2011
Golf Outing at LaQuinta Resort
Mountain Course
SATURDAY, DECEMBER 3, 2011
• Board of
Directors Meeting
• CFB, CTB,
CTCB Exam
• Tennis
Tournament
• New
Member/First Timer Orientation
• Welcome
Reception in Exhibit Hall
SUNDAY, DECEMBER 4, 2011
• Opening General Session & Breakfast
• Business Meeting
• Keynote Speaker
• Lunch Session: Awards
• Media Panel: Sports Trends & Projections
• Exhibitor Reception
Concurrent Sessions 1
1A – Tennis: Court Preparation, Removing
Coatings (Techniques, Equipment)
1B – Track: Track Facility Award Winners
(A Case Study of 3 Winners)
1C – Fields: Replacing Synthetic Turf Fields
After 8 Years
1D – Concrete I (Moisture/Vapor Testing, Design,
Prep, Vapor Barrier)
1E – General – How Not to
End up Holding the
Hot Potato: Allocating Responsibility and
Risk Through Contract Provisions
|
MONDAY, DECEMBER 5, 2011
Concurrent Sessions 2
2A – Tennis: Roundtable Discussion
2B – Track: CTB University (A Ground Up
Project Case Study – Part I)
2C – Fields: Sports Fields Diagnostics,
Analyzing Field Problems
2D – Concrete II (Moisture/Vapor Testing, Design,
Prep, Vapor Barrier)
2E – General – Get a
Social (Media) Life: Marketing
Your Business with Facebook, Twitter and
LinkedIn
Concurrent Sessions 3
3A – Tennis: Post Tension Concrete Overlays
(Case Study)
3B – Track: CTB University (A Ground Up
Project Case Study – Part II)
3C – Fields: Maintenance of Synthetic Turf
Fields: G-Max
3D – Installation of Indoor Synthetic Sports
Flooring (Rubber/PVC/Polyurethane/
Modular tile)
3E – General – Design
Process from Master Plan
to Construction Drawings
Concurrent Sessions 4
4A – Tennis: Roof-Top Surface Installations
4B – Track: Asphalt Acceptance
(As it Pertains to Slope)
4C – Fields: Sports Fields Construction &
Design (Architects, Builders, Owners)
4D – Maintenance Products (General
Maintenance/Polyurethane/PVC/Rubber/
Modular tile)
• Division Meetings
• Reception & Dinner
• Awards: Tennis, Track, Fields and Indoor
Facilities of the Year |